Not known Facts About Cast in Situ Piles in Bangladesh

As noticed within the figure below, steady auger is utilized to drill the borehole, raise up drilled soil, and pour concrete whilst the auger is moved up. Due to this fact, the borehole does not have to have casing or hydrostatic tension to stop harm to the borehole wall.আমাদের কোম্পানিতে দক্ষ সার্ভ

read more